|
|
Documents
Transfer stations
Transfer Station Driving Directions (PDF, 140 K)
Your Guide to King County Solid Waste Recycling and Transfer Facilities (PDF, 580 K)
Maria's Story - Why you Should Secure Your Load (PDF, 82 K)
This brochure - produced by the Washington State Department of Ecology - tells the story of Maria Federici and includes helpful tips for securing your load. Maria was seriously injured on Feb. 22, 2004 when an entertainment center fell from the back of a trailer in front of her.
Waste acceptance & waste clearance
Waste Acceptance Rule
King County Records, Elections and Licensing Services Web site.
Waste Clearance Application (PDF, 105 K)
Waste Clearance Application (Microsoft Word®, 270 K)
Waste Characterization Form (PDF, 70 K) A Public Health – Seattle and King County form used for industrial waste, contaminated soil and other wastes that may require testing before disposal.
Cedar Hills Regional Landfill – annual report & environmental monitoring reports
2012 Annual report
April 2013
2012 Cedar Hills Regional Landfill annual report (PDF, 2.1 MB)
This report includes a compilation of activity summaries and system evaluations associated with: landfill capacity; financial assurance cost estimates for closure and post-closure; landfill operations; personnel training program, and; Environmental Monitoring Program.
2012 Annual report attachments
2011 Annual report
April 2012
2011 Cedar Hills Regional Landfill annual report (PDF, 167 K)
This report includes a compilation of activity summaries and system evaluations associated with: landfill capacity; financial assurance cost estimates for closure and post-closure; landfill operations; personnel training program, and; Environmental Monitoring Program.
2011 Annual report attachments
- Attachment A – Remaining Capacity Analysis (PDF, 18 K)
- Attachment B – Financial Assurance Estimates (PDF, 29 K)
- Attachment C – Application for Annual Permit Renewal; Disposal Fees (PDF, 85 K)
- Attachment D – 2011 Groundwater Data Evaluation (PDF, 2 MB)
- Attachment D-I – Potentiometric Groundwater Surface Maps and Groundwater Velocity Calculations (PDF, 3.2 MB)
- Attachment D-II – Time-Concentration Plots Monitoring Well Hydrographs (PDF, 1.2 MB)
- Attachment D-III – Trilinear Diagrams and Ion Balance Calculations (PDF, 6.2 MB)
Note: this is a very large file and may take several minutes to download, depending on connection speed
- Attachment D-IV – Field and Analytical Data (PDF, 13 MB)
Note: this is a very large file and may take several minutes to download, depending on connection speed
- Attachment E – 2011 Landfill Gas Probe Monitoring Program Information (PDF, 2.2 MB)
- Attachment F – Landfill Topography and Settlement Monitoring Stations (PDF, 1 MB)
2010 Annual report
July 2011
2010 Cedar Hills Regional Landfill annual report (PDF, 1.3 MB)
This report includes a compilation of activity summaries and system evaluations associated with: landfill capacity; financial assurance cost estimates for closure and post-closure; landfill operations; personnel training program, and; Environmental Monitoring Program.
2010 Annual report attachments
- Attachment A – Remaining Capacity Analysis (PDF, 830 K)
- Attachment B – Financial Assurance Estimates (PDF, 810 K)
- Attachment C – Disposal Fees (PDF, 845 K)
- Attachment D – 2010 Groundwater Data Evaluation (PDF, 1.2 MB)
- Attachment D-I – Potentiometric Groundwater Surface Maps and Groundwater Velocity Calculations (PDF, 2.1 MB)
- Attachment D-II – Time-Concentration Plots Monitoring Well Hydrographs (PDF, 9.4 MB)
Note: this is a very large file and may take several minutes to download, depending on connection speed
- Attachment D-III – Trilinear Diagrams and Ion Balance Calculations (PDF, 6.7 MB)
- Attachment D-IV – Field and Analytical Data (PDF, 10.2 MB)
Note: this is a very large file and may take several minutes to download, depending on connection speed
- Attachment E – 2010 Landfill Gas Probe Monitoring Program Information (PDF, 1.3 MB)
- Attachment F – Landfill Topography and Settlement Monitoring Stations (PDF, 1 MB)
Environmental monitoring reports
2012, fourth quarter
Cedar Hills Regional Landfill quarterly environmental monitoring report (PDF, 5.6 MB)
2012, third quarter
Cedar Hills Regional Landfill quarterly environmental monitoring report (PDF, 6 MB)
2012, second quarter
Cedar Hills Regional Landfill quarterly environmental monitoring report (PDF, 18 MB)
Note: this is a very large file and may take several minutes to download, depending on connection speed
2012, first quarter
Cedar Hills Regional Landfill quarterly environmental monitoring report (PDF, 20 MB)
Note: this is a very large file and may take several minutes to download, depending on connection speed
Closed landfills
Map of closed landfills in King County (PDF, 240 K)
Closed landfill groundwater data reports
Closed landfill annual groundwater data evaluation reports are available through the King County Library catalog or from your neighborhood branch library.
Construction demolition & landclearing
Allied/Regional Disposal Company contract (PDF, 156 K)
Complete extended contract between King County and Allied/Regional Disposal Company outlining the handling of Construction Demolition & Landclearing (CDL) material in King County.
Waste Management of Washington, Inc. contract (PDF, 151 K)
Complete extended contract between King County and Waste Management of Washington, Inc. outlining the handling of Construction Demolition & Landclearing (CDL) material in King County.
top of page
|