King County Road Services - Capital Improvement Program
|
South Park Bridge #3179 - Replacement Project
|
Additional informationDocuments
South Park Bridge - Closure plan
Closure plan - summary
The summary is a 7-page version of the complete 53-page plan linked below.
Closure plan - full plan
Environmental Impact Statement
Landmarks Commission
Hydrographic reports
1928 planset for the Scherzer Rolling Lift bridge
Preliminary Design Report (11MB .pdf)
Other Studies and Reports
Draft Environmental Impact Statement and Section 4(f) Evaluation
Executive Summary (1MB .pdf)
Draft EIS (17MB .pdf)
Appendix Volume I
- Appendix G Summary Technical Report: Alternatives Development and Screening Report
- Appendix H Rehabilitation Feasibility Study Technical Memorandum
- Appendix I Structural Alternatives Study
- Appendix J Conceptual Plans
Appendix Volume II (17MB .pdf)
- Appendix K Transportation Technical Report
- Appendix L Relocations Technical Report
- Appendix M Land Use Technical Report
- Appendix N Economics Technical Report
- Appendix O Social Elements Technical Report
Appendix Volume IV (22MB .pdf)
- Appendix R Air Quality Technical Report
- Appendix S Noise Technical Report
- Appendix T Utilities Technical Report
Appendix Volume V (25MB .pdf)
- Appendix U Water Resources Technical Report
- Appendix V Fish, Wildlife, and Vegetation Technical Report
- Appendix W Geology and Soils Technical Report
Appendix Volume VI
- Appendix X Hazardous Materials Technical Report and Appendices
Updated: April 14, 2011
|
|
|